During critical production shutdown, a global energy company contacted Energy Bolting with an extremely urgent site requirement.
The requirement was for non-standard ring joint gaskets in 310 stainless steel, the items would need to be specially manufactured.
As is always the case during refinery shutdown - the goods were required on site within a matter of days.
Typically, this product would be supplied on a lead time of 3 weeks or more.
Energy Bolting offered the client exactly what they needed, order placed on Wednesday and goods were agreed to be on site in Europe within 3 days!
310 Stainless Steel ring joints manufactured from fully traceable European raw material and fully inspected within two days, take a look...
Only a day remained to meet clients delivery deadline and with engineers waiting on site - it was decided goods would have to be hand delivered via air.
The goods were hand delivered by Robin Hart-Archer on Saturday afternoon and installed on site Sunday morning.
Our client was extremely satisfied with our support, performance and flexibility to meet their critical deadline.
Energy Bolting supply a diverse range of special fasteners, machined components and associated products.
Find out more about our vision and values:
Find out more about what we do:
Send your enquiries for a prompt and competitive quotation sales@energybolting.com
留言