Ring Joint Gaskets for shutdown at oil refinery in Europe.

  • Writer: Dan Pearce
    Dan Pearce
  • Oct 21, 2018
  • 1 min read

Updated: Sep 7, 2020


During critical production shutdown, a global energy company contacted Energy Bolting with an extremely urgent site requirement.

The requirement was for non-standard ring joint gaskets in 310 stainless steel, the items would need to be specially manufactured.

As is always the case during refinery shutdown - the goods were required on site within a matter of days.

Typically, this product would be supplied on a lead time of 3 weeks or more.

Energy Bolting offered the client exactly what they needed, order placed on Wednesday and goods were agreed to be on site in Europe within 3 days!

310 Stainless Steel ring joints manufactured from fully traceable European raw material and fully inspected within two days, take a look...

Only a day remained to meet clients delivery deadline and with engineers waiting on site - it was decided goods would have to be hand delivered via air.

The goods were hand delivered by Robin Hart-Archer on Saturday afternoon and installed on site Sunday morning.

Our client was extremely satisfied with our support, performance and flexibility to meet their critical deadline.




Energy Bolting supply a diverse range of special fasteners, machined components and associated products.


Find out more about our vision and values:

Find out more about what we do:


Send your enquiries for a prompt and competitive quotation sales@energybolting.com



Energy Bolting Presentation
Energy Bolting Presentation

Comments


bottom of page